US 9W bridge replacement Mar 2008 to ?
26th April 2008
Coonstruction equipment and the reamining bridge looking south from Vineyard Avenue.
The demolition of the old bridge has progressed nearly to the northern abutment.
A longer view.
Looking south under the bridge from Vineyard Avenue.
The bridge, equipment and Vineyard Ave. all in one!
Another southern view with the old southern abutment. The new bridge abutment will be built over this one, saving time and money, no doubt.
Looks like spaghetti.
Slightly better view of the southern abutment.
Author: | Last modified: 2008-05-17
This album was created with
Album Shaper
, Radiant theme